A new tennis court in Sag Harbor costs $45,000–80,000 nationally by surface, with Hamptons quotes above that for the doubled setbacks, the sunken-court rules and a permit clock that runs 16–20 weeks behind in the Town of East Hampton. Tell us about the lot in Sag Harbor and the surface you want; one licensed, insured builder who has built in Village of Sag Harbor calls within one business day.
Last updated · Reviewed by South Fork Courts
A new court in Sag Harbor is a zoning question before it is a construction one: the 7,200 square feet have to fit the setbacks, the coverage cap and the clearing limit of Village of Sag Harbor first. We put Sag Harbor homeowners in touch with one licensed, insured builder who has built there before, and we publish the 2026 numbers.
New courts in Sag Harbor: what's different here
Village lots too small for a court, waterfront houses on the coves with room for one and a water table a few feet down, a nonprofit’s ten public courts at Mashashimuet Park, eight Har-Tru and two hard, and a historic district whose review board sees any hardscape visible from the street.
Bayfront Sag Harbor lots are village lots, and the court that fits is the one the coverage cap allows: sunk below grade for the neighbours, screened for the review board, with the water table checked by a test hole before the base goes in.
In the historic district of Sag Harbor the fence, the screening and anything visible from the street go before the review board, and a builder who has been there before saves a month.
The Board of Historic Preservation and Architectural Review issues a certificate of appropriateness for exterior changes visible from a street, and its scope names sidewalks, driveways, terraces, retaining walls and curbing; a court fence or barrier visible from the street is plausibly, not expressly, within it, so the builder we send you to asks first. Village lot coverage is a flat 20% for main and accessory structures together, and construction hours are Monday to Friday 8 a.m. to 7 p.m. and Saturday 9 a.m. to 5 p.m., no Sundays or holidays (Chapter 167, 2023).
Permits in Sag Harbor run through the Village of Sag Harbor Building Department and Board of Historic Preservation & Architectural Review inside the village; the Towns of East Hampton and Southampton beyond the village line; the court builder we put you in touch with handles the filing where one is required.
How it works
Tell us about the job once. One licensed, insured court builder who works Sag Harbor and handles new courts regularly contacts you within 1 business day. Free for homeowners, no spam calls.
FAQ
New courts questions
How much does a tennis court cost to build in the Hamptons?
More than the national guides say, and they say $45,000–80,000. A new court averages $65,000 nationally, from $25,000 at the low end to $150,000 at the high, with the surface setting the range: grass $20,000–75,000, asphalt $40,000–80,000, post-tensioned concrete $45,000–80,000, Har-Tru clay $60,000–90,000, cushioned acrylic $65,000–100,000; labor alone is $30,000–35,000. Fencing adds $5,000–15,000, lighting $2,000–6,000 where a village allows it, a backboard $5,000–10,000. No Long Island builder publishes a price, and the Hamptons adds what the national guides never see: a court sunk four feet below grade for the setback rules, which stakeholders in Sagaponack put at about $100,000 extra in 2012, a base designed for a water table a few feet down, and a permit clock that ran 16–20 weeks behind in the Town of East Hampton in 2026.
Read the full answer →Do I need a permit for a tennis court in the Hamptons, and can I light it?
Yes, everywhere: East End land-use counsel says a building permit and a certificate of occupancy are required for playing courts in every municipality here, and a court is an accessory structure with its own setbacks. The Town of Southampton names tennis courts in its rear-yard coverage (20%) and side-yard rules; the Village of East Hampton doubles the accessory setback for playing courts, expressly for noise, as its code is summarised; Sagaponack keeps the ordinary setback only for a court sunk four feet; and Southampton Village’s guidelines of August 17, 2026 require a sunken court, an acoustic analysis, a 10-foot barrier cap, screening, play from 8 a.m. to dusk and no lighting for night play. Lights elsewhere run into the noise codes and the review boards. Permits take 16–20 weeks in the Town of East Hampton and 2–4 in the Village.
Read the full answer →How long does it take to build a tennis court in the Hamptons?
Longer than the construction. Site preparation, excavation, backfill and grading, runs a few weeks to a month; a hard court then cures 30 to 60 days before the acrylic colour is applied and cures again before play; no builder we could read publishes a start-to-finish figure, so two to three months of construction after the permit is our floor, not a quote. In front of that sits the permit: the Town of East Hampton ran 16–20 weeks behind its 15-day clock in 2026, the Village of East Hampton issues in two to four weeks, and a sunken court, a variance or a board appearance adds its own calendar. The villages cap the working week too, no Sundays anywhere and Saturday noon to 4 in East Hampton Village in season. Book the builder in the fall for a court in July.
How does South Fork Courts work?
You tell us about the project once: where the lot is, what you want built, resurfaced, lit, fenced or looked after, the surface if you know it, and when. We put you in touch with one licensed, insured court builder who does that work in your town, and they call you within one business day. From there it is their site visit, their quote, their schedule and their warranty. It is free for homeowners; participating builders pay us a referral fee for the introduction. We are not a builder, a tennis club or a coaching business, and we do not sell your details; the one company we send you to is the only one that gets your number. We cover 9 South Fork towns and 6 kinds of court work.
Services
More in Sag Harbor
Har-Tru & Clay Courts in Sag Harbor
The South Fork’s surface: what Har-Tru is, why it plays in light rain, the $60,000–90,000 build and $2,000 a year after it, the weekly routine, two tons of spring top-dressing, and irrigation.
Court Resurfacing & Repair in Sag Harbor
Resurfacing at $8,000–12,000, an acrylic recoat at $4,000–10,000, an asphalt overlay at $20,000–40,000, cracks from $400, drainage fixes to $8,000, the 30–60-day cure, and why nobody publishes an interval.
Pickleball & Multi-Sport Courts in Sag Harbor
A pickleball court is 20 by 44 feet on a 30 by 60 pad, about four to a tennis footprint: what a conversion, a new court and a sport court cost, the 10-foot backstop, the noise, and Southampton Village’s 2026 rules.
Court Lighting, Fencing & Windscreens in Sag Harbor
Fencing at $5,000–15,000 and 8 feet high, lighting at $2,000–6,000 where allowed, backboards, nets, windscreens and ball machines, and the rules that cap the fence, ban the lights and send the barrier to the board.
Court Maintenance & Seasonal Care in Sag Harbor
What a court needs every week, spring and year: the Har-Tru routine and its two tons of top-dressing, the hard-court wash and algae treatment, the $1,800-a-year average and $2,000 for clay, rain and the season.
Book a court builder in Sag Harbor
Sixty seconds. One licensed, insured court builder who works your town calls you within one business day. Free for homeowners; nobody else gets your number.
We use what you send us only to put you in touch with the right court builder. Never sold, never used for marketing. Privacy policy.