How much does a tennis court cost to build in the Hamptons?
More than the national guides say, and they say $45,000–80,000. A new court averages $65,000 nationally, from $25,000 at the low end to $150,000 at the high, with the surface setting the range: grass $20,000–75,000, asphalt $40,000–80,000, post-tensioned concrete $45,000–80,000, Har-Tru clay $60,000–90,000, cushioned acrylic $65,000–100,000; labor alone is $30,000–35,000. Fencing adds $5,000–15,000, lighting $2,000–6,000 where a village allows it, a backboard $5,000–10,000. No Long Island builder publishes a price, and the Hamptons adds what the national guides never see: a court sunk four feet below grade for the setback rules, which stakeholders in Sagaponack put at about $100,000 extra in 2012, a base designed for a water table a few feet down, and a permit clock that ran 16–20 weeks behind in the Town of East Hampton in 2026.
Last updated · Reviewed by South Fork Courts
The national numbers (2026)
| Line | Range | Note |
|---|---|---|
| Full court, average | $65,000; most $45,000–80,000; $25,000–150,000 full range | one national guide (2025) |
| Blended, all court projects | $14,889; $5,776–24,002 | the other guide; includes small jobs and resurfacing |
| Grass | $20,000–75,000 | |
| Artificial turf | $25,000–80,000 | |
| Asphalt | $40,000–80,000 | 15–20 year life |
| Post-tensioned concrete | $45,000–80,000 | |
| Har-Tru clay | $60,000–90,000 | + about $2,000 a year |
| Cushioned acrylic | $65,000–100,000 | |
| Labor / materials | $30,000–35,000 / $10,000–50,000 | |
| Indoor court or bubble | $70,000–150,000 | |
| Fencing | $5,000–12,000 or $5,000–15,000 | 8 ft recommended |
| Lighting | $2,000–5,000 or $2,000–6,000 | banned for courts in Southampton Village |
| Backboard / net / lines | $5,000–10,000 / $200–300 / $300–600 |
Two cautions travel with that table. The two national cost guides publish the same by-surface figures to the dollar, so they are one dataset cited twice, not two confirmations; and their blended averages disagree by a factor of four because one counts every backyard job. Neither is a Long Island figure: Hamptons Tennis Company, building here since 1985, quotes by the site, and Har-Tru sells its budget planning as a consulting service.
What the Hamptons adds
Depth. Sagaponack’s 2012 compromise lets a court sunk at least four feet below grade keep the ordinary setback while a court at grade meets 150% of it, and the cost of sinking was put at about $100,000 then; Southampton Village’s guidelines of August 17, 2026 make four feet below grade the presumption for any new or converted court where the site allows. A sunken court is an excavation, a retaining structure, drainage and a wall of spoil to remove, on top of the court.
Water. The outwash ground south of the highway saturates in winter and the water table near the bays and ponds sits 2–8 feet down; Southampton Village asks a court to retain a two-inch storm on site. The base that handles that is the difference between the $45,000 court and the $80,000 one, and between a court that drains in year ten and one that cracks in year three.
Room and review. Doubled setbacks for playing courts in the Village of East Hampton (as its code is summarised) and, by counsel’s reading, across the East End; courts named in the Town of Southampton’s coverage and side-yard rules; fence caps of 4 and 6 feet that an 8-foot enclosure exceeds; a clearing limit in the Town of East Hampton that a 7,200-square-foot court eats a third of. Each is a variance, a site plan or a board, and each costs a survey, drawings and time.
Time. A building permit and a certificate of occupancy are required for a playing court everywhere here; the Town of East Hampton’s desk ran 16–20 weeks behind its 15-day clock in 2026, the Village of East Hampton two to four weeks. Builders price the season they lose.
What a fair quote contains
The base and its drainage, by name; the surface and its warranty; the fence, screens and gates; the sunken-court excavation and retaining work if the rules or the neighbours require it; the survey, permits and board appearances, and who attends them; the schedule against the village construction hours; and what the court will need every April. A quote that is only a surface and a price is quoting the wrong court.
Services
Related services
New Tennis Court Construction
A new court from $45,000 to $80,000 nationally by the surface you choose, the 7,200 square feet it needs, the setbacks, coverage caps and permit clocks the towns and villages add, and the season it takes.
Har-Tru & Clay Courts
The South Fork’s surface: what Har-Tru is, why it plays in light rain, the $60,000–90,000 build and $2,000 a year after it, the weekly routine, two tons of spring top-dressing, and irrigation.
Ready to talk to a real local pro?
Sixty seconds. One licensed, insured court builder who works your town calls you within one business day. Free for homeowners; nobody else gets your number.