Town of East Hampton
New Tennis Court Construction in Montauk, NY
A new tennis court in Montauk costs $45,000–80,000 nationally by surface, with Hamptons quotes above that for the doubled setbacks, the sunken-court rules and a permit clock that runs 16–20 weeks behind in the Town of East Hampton. Tell us about the lot in Montauk and the surface you want; one licensed, insured builder who has built in Town of East Hampton calls within one business day.
Last updated · Reviewed by South Fork Courts
A new court in Montauk is a zoning question before it is a construction one: the 7,200 square feet have to fit the setbacks, the coverage cap and the clearing limit of Town of East Hampton first. We put Montauk homeowners in touch with one licensed, insured builder who has built there before, and we publish the 2026 numbers.
New courts in Montauk: what's different here
Six Har-Tru courts at Montauk Downs State Park, the Town’s two on South Emery Street, the Montauk Tennis Club’s Hither Hills site and the Yacht Club’s renovated racquet center, and a hamlet of hillside and oceanfront houses where a private court is the exception and the wind is not.
On the ocean side of Montauk a court is built into wind and salt air: the fence carries windscreens most of the year, the posts are set for a nor’easter, and the sub-base is designed for a water table that sits a few feet down near the ponds; builders who work the beachfront in Montauk sink the court where the rules reward it and orient it north–south for the afternoon sun.
Montauk is a hamlet of the Town of East Hampton, so its private courts follow the Town: doubled setbacks for the noise-generating accessory structures by counsel’s reading of the pool rule, fences capped at 4 feet in front and side yards and 6 in the rear, no structure within 150 feet of a wetland, a permit desk 16–20 weeks behind in 2026, and a noise code of 65 dBA by day and 50 at night. The wind runs higher here than anywhere on the fork all summer, 8–10 mph on land on an August afternoon and more on the ocean, which decides the fence posts, the windscreens and, on a clay court, the irrigation.
Permits in Montauk run through the Town of East Hampton Building Department (with a Natural Resources Special Permit near wetlands and bluffs); the court builder we put you in touch with handles the filing where one is required.
How it works
Tell us about the job once. One licensed, insured court builder who works Montauk and handles new courts regularly contacts you within 1 business day. Free for homeowners, no spam calls.
FAQ
New courts questions
How much does a tennis court cost to build in the Hamptons?
More than the national guides say, and they say $45,000–80,000. A new court averages $65,000 nationally, from $25,000 at the low end to $150,000 at the high, with the surface setting the range: grass $20,000–75,000, asphalt $40,000–80,000, post-tensioned concrete $45,000–80,000, Har-Tru clay $60,000–90,000, cushioned acrylic $65,000–100,000; labor alone is $30,000–35,000. Fencing adds $5,000–15,000, lighting $2,000–6,000 where a village allows it, a backboard $5,000–10,000. No Long Island builder publishes a price, and the Hamptons adds what the national guides never see: a court sunk four feet below grade for the setback rules, which stakeholders in Sagaponack put at about $100,000 extra in 2012, a base designed for a water table a few feet down, and a permit clock that ran 16–20 weeks behind in the Town of East Hampton in 2026.
Read the full answer →Do I need a permit for a tennis court in the Hamptons, and can I light it?
Yes, everywhere: East End land-use counsel says a building permit and a certificate of occupancy are required for playing courts in every municipality here, and a court is an accessory structure with its own setbacks. The Town of Southampton names tennis courts in its rear-yard coverage (20%) and side-yard rules; the Village of East Hampton doubles the accessory setback for playing courts, expressly for noise, as its code is summarised; Sagaponack keeps the ordinary setback only for a court sunk four feet; and Southampton Village’s guidelines of August 17, 2026 require a sunken court, an acoustic analysis, a 10-foot barrier cap, screening, play from 8 a.m. to dusk and no lighting for night play. Lights elsewhere run into the noise codes and the review boards. Permits take 16–20 weeks in the Town of East Hampton and 2–4 in the Village.
Read the full answer →How long does it take to build a tennis court in the Hamptons?
Longer than the construction. Site preparation, excavation, backfill and grading, runs a few weeks to a month; a hard court then cures 30 to 60 days before the acrylic colour is applied and cures again before play; no builder we could read publishes a start-to-finish figure, so two to three months of construction after the permit is our floor, not a quote. In front of that sits the permit: the Town of East Hampton ran 16–20 weeks behind its 15-day clock in 2026, the Village of East Hampton issues in two to four weeks, and a sunken court, a variance or a board appearance adds its own calendar. The villages cap the working week too, no Sundays anywhere and Saturday noon to 4 in East Hampton Village in season. Book the builder in the fall for a court in July.
How does South Fork Courts work?
You tell us about the project once: where the lot is, what you want built, resurfaced, lit, fenced or looked after, the surface if you know it, and when. We put you in touch with one licensed, insured court builder who does that work in your town, and they call you within one business day. From there it is their site visit, their quote, their schedule and their warranty. It is free for homeowners; participating builders pay us a referral fee for the introduction. We are not a builder, a tennis club or a coaching business, and we do not sell your details; the one company we send you to is the only one that gets your number. We cover 9 South Fork towns and 6 kinds of court work.
Services
More in Montauk
Har-Tru & Clay Courts in Montauk
The South Fork’s surface: what Har-Tru is, why it plays in light rain, the $60,000–90,000 build and $2,000 a year after it, the weekly routine, two tons of spring top-dressing, and irrigation.
Court Resurfacing & Repair in Montauk
Resurfacing at $8,000–12,000, an acrylic recoat at $4,000–10,000, an asphalt overlay at $20,000–40,000, cracks from $400, drainage fixes to $8,000, the 30–60-day cure, and why nobody publishes an interval.
Pickleball & Multi-Sport Courts in Montauk
A pickleball court is 20 by 44 feet on a 30 by 60 pad, about four to a tennis footprint: what a conversion, a new court and a sport court cost, the 10-foot backstop, the noise, and Southampton Village’s 2026 rules.
Court Lighting, Fencing & Windscreens in Montauk
Fencing at $5,000–15,000 and 8 feet high, lighting at $2,000–6,000 where allowed, backboards, nets, windscreens and ball machines, and the rules that cap the fence, ban the lights and send the barrier to the board.
Court Maintenance & Seasonal Care in Montauk
What a court needs every week, spring and year: the Har-Tru routine and its two tons of top-dressing, the hard-court wash and algae treatment, the $1,800-a-year average and $2,000 for clay, rain and the season.
Book a court builder in Montauk
Sixty seconds. One licensed, insured court builder who works your town calls you within one business day. Free for homeowners; nobody else gets your number.
We use what you send us only to put you in touch with the right court builder. Never sold, never used for marketing. Privacy policy.